Ground and supports
A measured plan, level changes, drainage and a support solution defined for the model.
FROM ORDER TO SITE
Every step, before arrival.
Every capsule-home manufacturing project is coordinated with the client’s architect. Preparation starts with the design, applicable requirements and site, and continues through installation and connections.
Plan my projectSchedule and scope are confirmed in the proposal. Each stage depends on the model and the readiness of the site.
Together with the architect, we define the capsule home’s use, layout and applicable requirements. We review the site, access, connections and documentation needed for approval applications.
Configuration, included items, additional works, responsibilities and schedule are agreed before the order is confirmed.
We coordinate capsule manufacturing with the client’s architect alongside the preparation of supports, access and connection points in line with the agreed project.
The route, vehicle, manoeuvring area and unloading equipment are checked. A crane, if needed, is included in the planning.
The appointed team places the module on the prepared supports and completes the contracted assembly work.
Appointed professionals complete the agreed connections. Works, supplied equipment and any outstanding items are reviewed.
Before setting a delivery date, we review these four points with you.
A measured plan, level changes, drainage and a support solution defined for the model.
Clear width, turns, slopes, overhead clearance and any obstacles along the route.
Manoeuvring and positioning space, ground conditions and planned lifting equipment.
Electricity, water and drainage locations, distances, capacity and connection work.
This allocation helps prepare the project. The appointed parties and scope of each task are recorded before the order.
For capsule homes, coordinate manufacturing with the client’s architect, define the proposal and scope of supply, and organize the work and logistics included in the order.
Provide site information and access; arrange preparation and necessary approvals not included in the order, with the relevant professionals.
Specify and carry out the contracted technical work: supports, lifting, connections and relevant checks.
There is no single package for every site. The proposal should separate included items from those quoted separately.
01
02
If any of these items is included in the price, this should be stated. Applicable taxes and exclusions are also detailed in the proposal.
The route and unloading point need review: width, turns, slopes, overhead clearance and manoeuvring space. Share the location, photos and, if possible, an access video. Delivery is confirmed once logistics have been assessed.
The support solution is defined for the ground conditions, model and configuration. Levelling, supports, drainage and installation access need to be agreed before delivery. We do not assume that any plot allows a capsule to be placed directly on the ground.
The manufacturer describes provision for these connections. The project needs to define connection points, power requirements and routes to the capsule. Solar or off-grid solutions are considered separately and are not included by default.
Timing depends on the model, customisation, availability, transport and site preparation. The schedule should distinguish supply, delivery, installation and utility connections. Dates are confirmed in the proposal rather than promised as a fixed number of days for every project.
ASSEMBLED IN SPAIN · CAPSULE HOMES
All our capsule homes are assembled in Spain. Every manufacturing project is coordinated with the client’s architect and follows the solutions they approve for that project.
How we prepare your projectAssembly takes place in Spain, with a small proportion of imported components. Components that require certification are purchased in Spain.
The layout and technical solutions are agreed with the client’s architect. We manufacture according to their approvals: the project defines how each capsule is made.
Together with the architect, the Spanish requirements applicable to the intended use and site are defined, along with the documentation needed for approval applications. Authorizations are determined by the competent authority.
FORTELA HOGAR · ESPAÑA
Tell us the province, use and model. This is the first step towards assessing delivery and preparing a proposal.
Plan my projectLET’S TALK ABOUT YOUR PROJECT
Give us a call or send us a message. We’ll help you choose your space and take the next step.